Project Ref:
84515
Client: Simcoa Operations Pty Ltd
Project: Simcoa Furnace Expansion Project
Scope: 10t capacity winch designed to operate in ambient temperatures of 65-70°C


Eilbeck Winches Projects

12t Take-up Winch

12t Take-up Winch, Rio Tinto Kestrel Mine Extension

8t Take-up Winch

8t Take-up Winches, NCIG Coal Export Terminal Stage 2

Winches for Caval Ridge Project

Eilbeck Cranes contract comprises of 13 off Winches ranging in capacity from 3.5 to 19.4 tonne line pull, 86 off Sheaves ranging from 400 mm to 630…

Counter Weight Winch – Alcoa Myara Project

Eilbeck delivered a repeat order for counter weight winch located on the tail end of existing conveyor at Alcoa Myrar Mine site in West Australian…

Dynamic Winch for Take-up Conveyor Belt

Closed Loop Tension Control – a Winch for the 21st Century

YouTube Facebook

Sydney
53 Lancaster Street
Ingleburn NSW 2565
Phone: 61 (02) 9618 1904

Newcastle
1/50 Sandringham Avenue
Thornton NSW 2322
Phone: 61 (02) 4966 8022

Brisbane
3/12 Sudbury Street
Darra QLD 4076
Phone: 61 (07) 3376 8255

Mackay
32 Diesel Drive
Paget QLD 4740
Phone: 61 (07) 4998 5599

Perth
28 Jackson Street
Bassendean WA 6054
Phone: 61 (08) 9279 4800

Adelaide
2/23 Clovelly Avenue
Royal Park SA 5014
Phone: 61 (08) 8162 5150

Melbourne
321 Doherty’s Road
Truganina VIC 3029
Phone: 61 (03) 9369 7444

Copyright 2021 Eilbeck Cranes