Project: Koolyanobbing Ore Handling Plant 11MTPA Upgrades
Scope: 55kN & 40 kN M.R.C. Conveyor Take Up Winches

Ratchet & Pawl Brake System Functional Description

Overview
The Ratchet & Pawl Brake System (RPBS) is a combination of a manually operated holding Pawl/Ratchet & a semi-automated brake motor. The following document is a Functional Description of the brake & holding components & how these interface with the hoist drum.

Startup
In the powered down state, the Pawl is positively engaged into the ratchet slot located on the side of the hoist drum. All pulling forces on the wire rope are transferred from the ratchet slot to the pawl, which in turn isolates the geared motor from the counterweight forces.
Before operating the hoist, the operation manual must be read & all pre-start procedures/checks completed. Only authorised personnel should operate the system.
Check the status of the emergency stop & reset if required. The hoist will not be able to begin any motion if the emergency stop is depressed.

Sequences
HAUL IN – [PRESS RAISE] on the Operator Panel
The hoist geared motor will energise, release its failsafe electromechanical brake & rotate the hoist drum in the direction of hauling in the wire rope.
The Hoist Ratchet Slot will rotate away from the Pawl, thus disengaging the Pawl. The Pawl will continue to interface with each ratchet slot, through a rise & fall motion as the hoist drum rotates.
If the hoist Normally Closed Upper Working Limit Switch opens or the Normally Closed Emergency Stop is depressed the HAUL IN [RAISE] motion will stop.

PAYOUT – [PRESS LOWER] on the Operator Panel
The Pawl Disengaged Limit Switch[Normally Open] must be in the closed position AND the Pawl Engaged Limit Switch[Normally Closed] must be in the closed position to allow the hoist drum to begin the PAY OUT [LOWER] motion. For both these limit switch conditions to occur the Pawl must be located well clear of the ratchet slots on the hoist drum in the fully disengaged position.
The hoist geared motor will energise, release its failsafe electromechanical brake & rotate the hoist drum in the direction of PAYING OUT [LOWER] the wire rope.
If the Hoist Lower Working Limit Switch[Normally Closed] opens or the Normally Closed Emergency Stop is depressed the PAY OUT [LOWER] motion will stop. If the Pawl Disengaged Limit Switch[Normally Open] opens or the Pawl Engaged Limit Switch[Normally Closed] opens the motion will stop.

ENGAGE THE PAWL & RATCHET – [ACTIVATE THE BRAKE HAND RELEASE] on the Hoist Geared Motor
If the counter weight position is considered correct for operational &/or maintenance purposes, the Pawl must be relocated into the ratchet slot and the hoist drum payed out manually so the counterweight force is transferred from the ratchet slot face to the pawl face. IE: The Ratchet & Pawl are ‘hard up’.
This process is not selectable by electronic control & as such, is not a motion in which the hoist motor is energised.
With the Pawl lowered into an adjacent ratchet slot as shown in below view, release the manual override brake lever located at the rear of the hoist brake motor. This release operation should be completed in a pulsing style, which allows the brake to engage & release over a number of high speed cycles which in turn reduces the acceleration due to gravity, take up speed & shock load of the Pawl & Ratchet slot faces coming together at elevated speed.
With this final operation complete, the geared brake motor is isolated from the counter weight forces, which significantly increases the long term use of these components.

Eilbeck Winches Projects

42t Winch for FQM

Eilbeck Winches Towering Tough International Competition, and Proudly Exporting to Panama, Central America.

15t Man-riding Winches

Special 15t man riding winches used to pull slip form and finishing platform with people riding on it.

Bechtel's Amrun Project Maintenance Winches

Design, manufacture and delivery of the special and unique hydraulic winches for the Amrun Project through Bechtel Australia.

Winches Bechtel Amrun Weipa

These take-up winches are operated automatically through the Client’s Process Control System (PCS) to maintain tension in the belt conveyor through the various stages of operation (starting, running and stopping under any load condition and under normal and upset operating…

12t Boom Luffing Winches

After a successful supply of a replacement winch for boom luffing winch system in 2014 on Huntly 190 stacker, Alcoa engaged Eilbeck Crane Winch Division to supply a second 115 kN Line pull winch

37t & 12t Take-up Winches

Each conveyor take-up winch is supplied as a fully assembled unit which consists of winch frame, rope drum, electric motor, motor brake, pawl system, slew bearing and planetary gear

Oaky Surface Winches

Each conveyor take-up winch is supplied as a fully assembled unit which consists of winch frame, rope drum, electric motor, motor brake, pawl system, slew bearing and planetary gear. The wire rope is also part of the winch and supplied loose.

50kN Tele Chute Winch

Billiton Mitsubishi Alliance Coal Operations PL, Hay Point - 50kN Tele Chute Winch, Tilting Bridge Hoist Assembly Telescopic Chute Winch

Winches Yandi Sustaining Project

Each conveyor take-up winch is supplied as a fully assembled unit which consists of winch frame, rope drum, electric motor, motor brake, pawl system, slew bearing and planetary gear.

30t Apron Feeder Retraction Winch

E-2411 Samsung Roy Hill Car Dumper APF & D/C 30t Apron Feeder Retraction Winch for RCR Mining Pty Ltd

11t & 13.5t Take Up Winches and 630mm Sheaves

2 x 11t & 1 x 13.5t Take Up Winches & 18 x 630mm Sheaves for West Angelas Deposit B Project

YouTube Facebook

Sydney
53 Lancaster Street
Ingleburn NSW 2565
Phone: 61 (02) 9618 1904

Newcastle
1/50 Sandringham Avenue
Thornton NSW 2322
Phone: 61 (02) 4966 8022

Brisbane
3/12 Sudbury Street
Darra QLD 4076
Phone: 61 (07) 3376 8255

Mackay
32 Diesel Drive
Paget QLD 4740
Phone: 61 (07) 4998 5599

Perth
28 Jackson Street
Bassendean WA 6054
Phone: 61 (08) 9279 4800

Adelaide
2/23 Clovelly Avenue
Royal Park SA 5014
Phone: 61 (08) 8162 5150

Melbourne
321 Doherty’s Road
Truganina VIC 3029
Phone: 61 (03) 9369 7444

Copyright 2023 Eilbeck Cranes