Project Ref: |
70075 |
|
Client: | BMA Coal Operations PL | |
Project: | Hay Point |
|
Scope: | 50kN Tele Chute Winch (Tilting Bridge Hoist Assembly Telescopic Chute Winch) |
8t Winch and Sheaves
Take-up Winches and Sheaves - Duro Felguera
Winches and Sheaves for Roy Hill Iron Ore
18t Tilting Bridge Winch and 15.5t Shuttle Winch
18t Tilting Bridge Winch - Hoist System & 15.5t Shuttle Winch Groote Eylandt Mining
The Winch Control System includes an embedded IEC 61131 control program. With modern VSD technology interfaced to the…
These quality custom made winches built with an integrated engineering solutions with special electrical systems.
Overland Conveyor Take Up Winch Jimblebar
Eilbeck Crane has successfully completed the contract to supply a large conveyor 100t Take Up Winch for the Jimblebar…
Counterweight Winches – Rio Tinto Marandoo
The winch system is used to position the counterweight within the acceptable travel limits in the take-up tower.
Kestrel Mine Extension - AM05 & AM07 Winches
60kN Winch Closed Loop Tension Control
12t Take-up Winch, Rio Tinto Kestrel Mine Extension
8t Take-up Winches, NCIG Coal Export Terminal Stage 2
Winches for Caval Ridge Project
Eilbeck Cranes contract comprises of 13 off Winches ranging in capacity from 3.5 to 19.4 tonne line pull, 86 off Sheaves…
Counter Weight Winch – Alcoa Myara Project
Eilbeck delivered a repeat order for counter weight winch located on the tail end of existing conveyor at Alcoa Myrar…
Sydney
53 Lancaster Street
Ingleburn NSW 2565
Phone: 61 (02) 9618 1904
Newcastle
1/50 Sandringham Avenue
Thornton NSW 2322
Phone: 61 (02) 4966 8022
Brisbane
3/12 Sudbury Street
Darra QLD 4076
Phone: 61 (07) 3376 8255
Mackay
32 Diesel Drive
Paget QLD 4740
Phone: 61 (07) 4998 5599
Perth
28 Jackson Street
Bassendean WA 6054
Phone: 61 (08) 9279 4800
Adelaide
2/23 Clovelly Avenue
Royal Park SA 5014
Phone: 61 (08) 8162 5150
Melbourne
321 Doherty’s Road
Truganina VIC 3029
Phone: 61 (03) 9369 7444